Our project for the day involved wiring new electrical from the well and septic to the house.
TJ had me wire across the rafters. It reminded me of when I put 100 feet off ethernet cable to connect to a hub when installing the equipment for my dads EMR system.
I got to go into the crawl space to find conduit which I never found after six attempts.
I did find some poly tubing that the conduit was supposedly under and pulled it up to the hole in the wall which was completely unnecessary.
While I was trying to find the conduit TJ and Kurt installed the pipes to connect the cistern pump and install the floaters.
I got to watch a cool tractor filling in a foundation










No comments:
Post a Comment