Tuesday, May 3, 2016

Pump Technician Day 12


We worked on Kenrick's well system which required removing the roof of the pump house.


Here is the roof lowered to the ground.


Here is the old setup.


Each pipe was 3 inches wide and 20 feet long.



Here are the pipes all laid out. They are around 43 years old.


Here is the pump and old wiring ready to be taken back to the shop.

No comments:

Post a Comment